Installation of 2 Tonne per Hour potato wedge cutting and blanching line
Our team provided expert installation services for cabling and containment between the client’s wedge cutting and blanching line over a 35m run from the main control panel to each device. Detail cable schedule issued in the electrical schematics. CY cable specified for motor and power connections, 'YY' cable for control system connections and screened pair for analogue/digital devices. Cables bundled and tied to 304 grade stainless steel basket containment using blue metal detectable cable ties.
(16033)