Wastewater treatment plant upgrade...

Suffolk, December 2019

Design, assembly and electrical installation of an upgraded control system for treatment of up to 200 cubic metres of wastewater per day

Controlled from our updated control panel using Siemens S7-1500 PLC and Siemens Touch Comfort 15” HMI with Siemens G120C VSD and a fibre optic link between the existing system and new AD plant, this system increased wastewater treatment capacity at a leading Apple juice, cyder and vinegar producer utilising existing plant wherever possible to provide a total treatment rate of 200 cubic metres per day. The original aeration tank and plant room container were retained with our new control panel adopting and integrating to the existing remaining equipment. The project covered design engineering, software and hardware through to control panel assembly, installation and commissioning to complete as the client required. Remote access is incorporated for trouble shooting and diagnostics.

(16792)

Value £100K
Client UK Apple Juice, Cyder and Vinegar Producer
Location Suffolk
Time 8 Weeks

More Projects

COVID-19 Critical Work Team

COVID-19 Critical Work Team, April 2020

View Project
Pharmaceutical Distribution System Installation

Leicestershire, April 2020

View Project
Electrical Installations on 8 x process skids...

Leicestershire, January 2020

View Project

What's New?